Main features of the project:
The load is insufficient; after removing the color steel tiles, directly install aluminum alloy waterproof brackets and photovoltaic panels.
Completion time:
March 2022
Industry:
Paper products
Original roof condition:
Color steel tile roof, insufficient load-bearing capacity.

