Main features of the project:
The load is insufficient; after removing the color steel tiles, directly install aluminum alloy waterproof brackets and photovoltaic panels.
Completion time:
April 2025
Industry:
Mechanical equipment
Original roof condition:
Remove the color steel tile roof and lay it directly.

